Comparison Matrix

clipart902349_edited.png
Apples vs Apples
clipart902349_edited.png

We have developed an at-a-glance comparison matrix that demonstrates the different ways that Sprung tensioned membrane structures outperform and outlast pre-engineered metal and conventional construction buildings.

Feature
Sprung Structures
Pre-Eng. Metal Building
Conventional Construction

 

Delivery

 

Sprung structures are normally delivered 3weeks from order

 

6-16 weeks from order

 

8-12 months

Shipping

Compact shipping:

Sprung structures, 1400 m² can be shipped in one 40′ ISO container or on one 48′ flatbed

560 m² per load

n/a

Foundations

If appropriate soil conditions exist, concrete foundations are not required on Sprung structures up to 48 m wide

Yes – no exceptions

Yes – no exceptions

Construction time on building envelope

46 m² to 185 m² per day, depending on options, complete with finished interior for a Sprung structure

After foundation is in place, a pre-engineered metal building can go up to 734 m² within 4 weeks

12-18 months for conventional construction

Overall fast-track construction timeline. Groundbreaking to completion

1-6 months for a Sprung structure

6-9 months for a pre-engineered metal building

12-18 months conventional construction

Maintenance schedule

A Sprung structure has a rust-free aluminum substructure. Sprung’s patented tensioning system does not require any retensioning of membrane panels for the life of the structure

A standing seam metal roof is prone to large thermal movements. This causes leaks and requires continuous maintenance, especially at penetrations.

Regular maintenance is required.

Expandability

Adding additional modules Sprung structure is easy

Renovation required

Renovation required

Exterior color options

Sprung structures offers unlimited color options

Limited

Limited

Flexibility to relocate

Yes

No

No

Daylight panels

Standard feature: daylight panels in peak of a Sprung structure provide an optimum amount of natural daylight

Significant extra cost

Significant extra cost

Airtight building Envelope Efficiency

Air permeability is almost 0 in a Sprung structure, resulting in superior energy performance.

Poor air-tightness

Moderate air-tightness

Acoustics

Excellent acoustical properties with our comprehensive insulation package and “soft wall” interior membrane

Significant additional costs associated with acoustic treatments needed to make a metal building acceptable for any application where acoustics are a concern (gymnasiums, public assembly, churches, casinos, offices etc.

Limited performance

Comparison Matrix English.jpg
icon

Our global manufacturing and distribution resources ensure fast delivery. Build at a rate of up to 2,000 sq. ft. (186 sq. m.) per day.

icon

Easily reconfigure, disassemble or relocate. The clear span design is adaptable for multi-use applications in almost any market sector.

icon

Our aluminum substructure and patented tensioning system are engineered to outperform and outlast other types of construction..

icon

You can count on lower project costs, decreased operating and energy expenses, and reduced maintenance costs.

Partner of

Sprung-Logo

Sprung is the main partner for our and your projects. With over 130 years of experience and over 13,000 buildings already built in over 100 countries, Sprung is an excellent, competent partner for innovative and efficient building projects.

Sprung designs and implements your construction projects together with your local partners. If desired, the material can be delivered directly to the site by Sprung. Sprung also ensures on-site technical support. An engineer provided by Sprung accompanies and supervises the construction on site. Nothing is left to chance!